1 Answer
1. At the start of the operation, steel wire rope will lift the grab on the appropriate location, and is put down. At this moment the lower beam under the gravity forces to unfold the bucket. When the bucket opens to the ears of touching boards to collide, which means to the maximum limit.
2. Fall the grab on to loose debris and close steel wire rope back to the its original central position, thus complete the grab materials process.
3. Filled with material and promote the open and closed steel wire rope. The grab bucket is hoisted and moved to the required dumping place on the ground . Open the grab to unload the materials.
You can get more details at this website: http://www.industrial-crane.com/product/grab-bucket/multivalve-grab-L-type.html